© Copyright 2012 Wilkey's Construction. All rights reserved. Powered by J.Love Design Studios
Tank & Line Upgrades

• Phase I and II EVR
• Tank Replacements
• Design
• Permitting
• ORVR
• Re-Pipes
• Dispenser Change-Outs
• Sump Change-Outs
• Water Intrusion

EVR Upgrades​​

Enhanced Vapor Recovery is required for gasoline dispensing facilities with underground storage tanks that are already required to have a vapor recovery system. Air districts that are in attainment with the state ozone standard are exempt from most EVR requirements. We are up to date with all necessary requirements and will help your business through this process.



GALLERY  |  JOBS  |  CONTACT